1. Final Submission Review and Verification
SayPro undertook a thorough review of all documentation to ensure alignment with the specific requirements outlined in each Request for Tender (RFT), including:
- Compliance Checks: Verifying that all documents required by the tendering authority (technical proposals, financial proposals, registration certificates, tax clearance, BEE certificates, etc.) were included and up to date.
- Formatting & Structure: Ensuring that documents adhered to formatting requirements (font type, page limits, templates, etc.) and that the structure followed the order specified in the RFT.
- Signature Verification: Confirming that all pages requiring authorization were properly signed by the authorized representatives of SayPro.
- Annexure and Attachments Review: Ensuring that all annexures and required attachments (e.g., CVs, past project references, declaration forms) were accurately completed and appended.
2. Tender Submission Checklist Management
A Submission Compliance Checklist was developed and maintained for each tender opportunity to track the status of:
- Document collection
- Internal approvals
- Formatting
- Printing and binding (if required)
- Uploading to online portals or submission at physical addresses
- Submission receipts and proof of delivery
This ensured accountability and real-time tracking of submission readiness.
3. Submission Logistics and Coordination
- Digital Submission Coordination: For tenders requiring online submission (e.g., through eTender portals or emails), SayPro ensured:
- Proper file naming and file format adherence.
- Successful upload of all components before deadlines.
- Confirmation receipts/screenshots as proof of submission.
- Physical Submission Support: Where physical delivery was required:
- Documents were professionally printed, bound, and sealed as per instructions.
- Timely courier or in-person delivery was arranged.
- Delivery acknowledgments were retained and filed for audit purposes.
4. Quality Assurance and Internal Sign-Off
Prior to each final submission, a final quality assurance step was undertaken involving:
- Peer review by a second administrative officer.
- Final approval from the Tender Oversight Officer or Designated Manager.
- Clearance against a pre-submission QA checklist.
This process ensured that all deliverables met SayPro’s internal quality standards and reduced the risk of disqualification due to administrative oversights.
5. Post-Submission Documentation and Reporting
After submission, the following actions were completed:
- Filing of complete submission packs (both hard and soft copies).
- Recording submission details (date, time, tender reference, authority, submission method) in the Tender Register.
- Preparation of a Post-Submission Summary Report highlighting lessons learned, compliance performance, and any challenges encountered.
Conclusion
During January, SayPro ensured that all tender submissions were compliant, complete, and submitted on time. The structured and meticulous approach to Submission Support under SCMR-1 played a critical role in maintaining SayPro’s credibility and competitiveness in the public and private procurement sectors.