  • SayPro Conduct the evaluation of all submissions based on set criteria

    SayPro Tasks to Be Done for the Period: Week 2 (01-08-2025 to 01-14-2025)

    Objective:

    To conduct the evaluation of all submissions based on the established criteria from SayPro Monthly January SCMR-1: SayPro Monthly Awarding Contracts.


    1. Review of Submitted Proposals

    Task:

    • Review all submissions for SayPro Monthly January SCMR-1 (Awarding Contracts).
    • Ensure completeness of each submission against the checklist provided in the SCMR-1 documentation.
    • Verify the date of submission to ensure that all proposals are within the eligible submission window.
    • Categorize the submissions based on contract type (e.g., consulting, technology, staffing, etc.) for ease of evaluation.

    Details:

    • Ensure that all necessary documents, forms, and supporting information required by SCMR-1 are present.
    • If any proposal is incomplete or lacks required documentation, flag it for follow-up with the respective team or vendor for clarification.
    • Log and catalog each submission in the project management system for tracking.

    2. Set Evaluation Criteria Review

    Task:

    • Review the evaluation criteria specified in the SayPro Monthly SCMR-1 (January) Awarding Contracts guidelines.
    • Ensure alignment of evaluation procedures with company policies and any external regulatory or contractual standards that apply.

    Details:

    • Ensure the evaluation criteria cover aspects such as price competitiveness, quality of proposal, vendor experience, compliance with contract terms, delivery timelines, and alignment with SayPro’s strategic goals.
    • Double-check that all evaluators are briefed on the criteria and any changes to the evaluation process since the previous month.
    • Organize the criteria in a weighted scoring system to ensure that each submission is evaluated fairly and comprehensively.

    3. Assign Evaluation Teams

    Task:

    • Assign evaluation teams to assess submissions based on their areas of expertise.
    • Each evaluation team should include at least one person with a technical understanding (for product-related submissions) and one with a business acumen (for financial aspects, contract negotiations, and vendor experience).

    Details:

    • Document team assignments clearly, ensuring each evaluator understands their role in the process (e.g., financial review, compliance, technical expertise).
    • Provide evaluators with training or a refresher on the evaluation process if necessary.

    4. Conduct Evaluation of Submissions

    Task:

    • Evaluate all submissions using the predefined scoring system that is based on the established criteria.
    • Ensure that each submission is evaluated thoroughly and scored individually on factors such as:
      • Price competitiveness (value for money)
      • Experience and track record of the vendor
      • Technical proposal (feasibility, quality, innovation)
      • Delivery timelines and guarantees
      • Compliance with all terms and conditions
      • Potential risks and mitigation strategies

    Details:

    • Assign scores according to the weighted criteria outlined in the SCMR-1 guidelines.
    • Make sure to maintain objectivity and transparency throughout the evaluation process. Each evaluator should document the rationale behind their scores.
    • If necessary, conduct follow-up interviews with vendors for additional clarifications on specific aspects of their proposal.

    5. Consolidation of Evaluation Results

    Task:

    • Compile the individual scores from all evaluators for each submission.
    • Calculate final scores based on the weighted average or other pre-agreed methodology.
    • Create a consolidated report summarizing the evaluation results for each submission.

    Details:

    • Review the scoring consistency among the evaluators to ensure no discrepancies or misunderstandings.
    • Ensure that the report includes narrative feedback for each submission, providing constructive insights for decision-makers.

    6. Vendor Clarifications (If Needed)

    Task:

    • Reach out to vendors if there are any uncertainties or missing information in their submission.
    • Request clarification or additional documentation where necessary to complete the evaluation.

    Details:

    • Clearly outline the areas needing clarification, and set a reasonable deadline for the vendor’s response.
    • Document any vendor communications and incorporate the new information into the evaluation process.

    7. Decision Making and Recommendation

    Task:

    • Based on the results of the evaluations, recommend the most suitable vendors for contract awards.
    • Ensure the recommendations align with SayPro’s strategic goals, budgetary constraints, and quality standards.

    Details:

    • Review the top scoring submissions to confirm their alignment with business priorities.
    • Make final decisions on contract awards based on the evaluation results.
    • Ensure that all vendor recommendations are backed by clear documentation from the evaluation process.

    8. Feedback to Non-Selected Vendors

    Task:

    • Notify vendors who were not selected, providing constructive feedback where appropriate.
    • Ensure the feedback process is professional and encourages future participation in SayPro opportunities.

    Details:

    • Use feedback as an opportunity to maintain good relationships with vendors, should they wish to submit in future cycles.
    • Document the reasons for non-selection to avoid misunderstandings and ensure fairness.

    9. Documentation of Evaluation Process

    Task:

    • Ensure that the entire evaluation process is properly documented.
    • Archive all materials, including evaluation forms, scoring sheets, vendor communications, and final decision documents.

    Details:

    • Maintain records in compliance with SayPro’s legal, regulatory, and audit requirements.
    • Organize the evaluation materials in a way that makes it easy to retrieve for internal audits or external reviews.

    10. Final Approval and Contract Award Notification

    Task:

    • Seek final approval from senior management or the appropriate authority for the selected vendors.
    • Send out official notifications to the chosen vendors regarding the award of contracts.

    Details:

    • Ensure that the notification includes all contract terms, deadlines, and expectations moving forward.
    • Coordinate the preparation and signing of contract agreements.

    Summary of Tasks

    • Review submissions for completeness and categorization.
    • Ensure alignment with evaluation criteria.
    • Assign evaluators and ensure clear roles.
    • Conduct thorough evaluation and scoring of all submissions.
    • Compile evaluation results and make recommendations.
    • Provide feedback to non-selected vendors.
    • Document the process for transparency and accountability.
    • Obtain final approval and notify selected vendors.

    By the end of Week 2 (01-08-2025 to 01-14-2025), the goal is to complete the evaluation process and have selected vendors ready for contract award.

  • SayPro Review and verify that all documents are complete and eligible for evaluation

    SayPro Tasks to Be Done for the Period: Week 1 (01-01-2025 to 01-07-2025)

    Task 2: Review and Verify That All Documents Are Complete and Eligible for Evaluation

    • Objective: Ensure that all documents submitted as part of the tenders, bids, and proposals for the upcoming contracts are complete, accurate, and eligible for evaluation. This step is crucial to prevent delays and ensure compliance with SayPro’s procurement process before proceeding to the awarding stage.

    Action Steps:

    1. Review All Submitted Documents:
      • Scope of Review: Review each tender, bid, and proposal submitted for compliance with the required documents as outlined in the SayPro Monthly Awarding Contracts (SCMR-1). This includes verifying that each submission contains all necessary paperwork, including:
        • Tender/Bid Proposal Forms
        • Company Profile and Qualifications
        • Technical Specifications or Proposals
        • Financial Bids or Price Quotations
        • Certifications (e.g., financial, regulatory, tax compliance)
        • Supporting Documentation (e.g., performance bonds, insurance certificates, proof of experience)
    2. Check for Missing Documents:
      • Identify Gaps: Systematically check each submission to identify missing documents or sections that are required for evaluation. This could include missing signatures, incomplete forms, or lack of supporting documentation.
      • Cross-Reference with Tender Requirements: Refer back to the official tender/bid specifications to cross-check that all mandatory documents have been submitted. If the procurement requirements specify that certain forms, certifications, or compliance documents are necessary (e.g., proof of previous work experience or technical compliance), confirm that these have been included.
    3. Verify Document Completeness:
      • Confirm Document Validity: Verify that each document is valid, correctly filled out, and complete. For example:
        • Ensure that the financial proposal includes a breakdown of costs and complies with the budgetary guidelines.
        • Ensure that all certifications are up-to-date, with valid expiry dates if applicable.
        • Confirm that technical proposals fully address the specifications outlined in the tender documents.
    4. Verify Eligibility Criteria:
      • Eligibility Requirements: Ensure that all tendering parties meet the eligibility requirements specified in the tender documents. This may involve:
        • Confirming that vendors or contractors have the necessary legal, financial, and technical qualifications.
        • Verifying that bidders have demonstrated past performance on similar projects or that they meet specific certification standards.
        • Ensuring that vendors are registered with relevant authorities and possess necessary licenses (e.g., tax identification, legal status).
    5. Cross-Check Compliance with Regulatory and Legal Requirements:
      • Regulatory Compliance: Verify that the tenders comply with local and international procurement laws, industry standards, and SayPro’s internal policies. Check for compliance with the following:
        • Anti-Corruption Policies: Ensure that the submission adheres to anti-bribery and anti-corruption standards, including any declarations of ethical conduct.
        • Equal Opportunity Requirements: Confirm that the process complies with non-discrimination and diversity standards, particularly where applicable.
        • Environmental and Safety Standards: Ensure that the proposal meets required environmental and safety regulations where applicable.
    6. Contact Vendors for Clarifications:
      • Follow Up on Incomplete Submissions: If any documents are missing, unclear, or incomplete, reach out to the respective vendors for clarification or resubmission. Allow a reasonable timeframe for vendors to address any gaps. Ensure clear communication on the necessary corrections.
      • Request Additional Information if Needed: If any documents appear ambiguous or unclear, request additional information or clarification from the vendors to ensure the proposal can be evaluated properly.
    7. Organize and Update the Submission Record:
      • Log of Completed and Incomplete Submissions: Maintain a log or database indicating which submissions are complete and eligible for evaluation and which require follow-up actions. This log should also track the progress of any clarifications or additional documents requested from vendors.
      • Notify Stakeholders of Document Status: Once the review process is complete, share the results with relevant stakeholders, including the procurement committee and project managers, to keep everyone informed of the status of submissions.
    8. Prepare Evaluation Readiness Report:
      • Final Verification: After all required documents have been reviewed and clarified, prepare a summary report that outlines which tenders, bids, or proposals are ready for evaluation and which still need further clarification or action.
      • Prepare Evaluation Committee for Next Steps: Provide the Procurement Committee with a status update, and prepare them for the next phase—evaluating the tenders according to the selection criteria (e.g., cost, technical ability, compliance).
      • Highlight Any Risk Areas: If there are concerns about any of the submissions (e.g., non-compliance with mandatory requirements or late submissions), highlight these in the report for the committee’s awareness.

    Timeline:

    • 01-01-2025: Begin reviewing all tender, bid, and proposal documents for completeness.
    • 01-03-2025: Complete the review of all submissions, noting any missing or incomplete documents.
    • 01-04-2025: Communicate with vendors for follow-ups and clarification on missing documents.
    • 01-05-2025 to 01-07-2025: Finalize the eligibility verification, ensuring all documents are complete, organized, and ready for evaluation by the procurement committee.

    Expected Outcome by End of Week 1 (January 7, 2025): By the end of Week 1, all submitted tenders, bids, and proposals should be thoroughly reviewed for completeness and eligibility. Any missing or incomplete documents will be addressed and clarified. A comprehensive eligibility report will be prepared, ensuring that the procurement committee is ready to proceed with the evaluation phase in the subsequent weeks.

  • SayPro Collect all submitted tenders, bids, and proposals for upcoming contracts

    SayPro Tasks to Be Done for the Period: Week 1 (01-01-2025 to 01-07-2025)

    Task 1: Collect All Submitted Tenders, Bids, and Proposals for Upcoming Contracts

    • Objective: Gather all tenders, bids, and proposals submitted for upcoming contracts for the month of January 2025, in preparation for the awarding process.
    • Action Steps:
      1. Review Contracting Opportunities: Begin by reviewing the full list of contracting opportunities that were open for bidding throughout the previous months, particularly focusing on those that close on or before January 1st, 2025.
      2. Request Submissions from Relevant Departments: Reach out to the procurement department, as well as project management teams, to request access to all tender submissions for upcoming contracts. This may include:
        • Printed or digital tender documents
        • Bids and proposals
        • Any supporting documentation (e.g., technical specifications, compliance certifications, etc.)
      3. Ensure Completeness of Submissions: Cross-check with the procurement team to ensure that all bids and proposals have been fully submitted and include the necessary information required for evaluation. This step may involve following up with contractors and suppliers to ensure that no vital documents are missing.
      4. Digitize Physical Copies: If any of the tenders or proposals are submitted in physical format, digitize them into a standard format (e.g., PDF) for easy storage and access. Utilize a document management system (DMS) or a secure cloud storage service.
      5. Organize Tender Submissions: Sort all collected tenders, bids, and proposals into appropriate categories. For example:
        • By Contract Type: Such as construction, IT services, maintenance, etc.
        • By Vendor/Contractor: Sorting proposals by the name of the submitting party.
        • By Evaluation Criteria: Organizing proposals by key performance indicators (KPIs), compliance with the requirements, etc.
      6. Document Receipt of Submissions: Maintain a log of all submissions, including:
        • The date the submission was received
        • Name of the submitting party
        • Contact details of the point of contact (if applicable)
        • Specific project or contract associated with the tender or bid
      7. Ensure Compliance with Tendering Regulations: Double-check that all tenders are in compliance with relevant regulatory requirements, such as local procurement laws, industry standards, and SayPro’s own internal procurement policies.
      8. Prepare Summary Report: Once all tenders and proposals have been collected, prepare a detailed summary report. This report should include:
        • A list of all tenders, bids, and proposals received
        • Status of each submission (whether complete or incomplete)
        • A brief overview of the projects they relate to
        • An outline of any immediate follow-up or additional clarifications needed
      9. Submit to Procurement Committee: Once the collection and report preparation are complete, submit the full set of documents and the summary report to the Procurement Committee for review. Ensure that all relevant stakeholders are notified for the upcoming awarding process, which will begin according to the SayPro Monthly Awarding Contracts schedule.

    Timeline:

    • 01-01-2025: Start collecting all relevant tenders, bids, and proposals from various departments.
    • 01-03-2025: Review the submissions to ensure completeness and compliance.
    • 01-04-2025: Digitize and organize all submissions in preparation for a detailed summary.
    • 01-05-2025 to 01-07-2025: Finalize and submit the summary report to the Procurement Committee, ensuring any necessary follow-ups are initiated.

    By the end of Week 1 (January 1st to January 7th), all tender, bid, and proposal submissions for upcoming contracts should be collected, organized, and made ready for the subsequent stages of the procurement process, as outlined in the SayPro Monthly Awarding Contracts document.

  • SayPro Vendor Performance Monitoring Report

    A document tracking the ongoing performance of awarded vendors to ensure they meet contract terms

    Contents of the Report:

    1. Vendor Information:
      • Vendor Name: Full legal name of the vendor.
      • Vendor ID/Code: Unique identification number for internal tracking.
      • Contract Number/Details: Reference number of the contract awarded, including the start and end dates, the terms, and scope of the agreement.
      • Report Period: The specific time frame covered by the report (e.g., January 2025).
    2. Performance Evaluation Metrics:
      • Quality of Deliverables: Evaluation of the product or service quality as per the contract terms.
      • Timeliness/Delivery Performance: Assessment of whether the vendor delivers goods/services according to the agreed timelines. This may include on-time delivery rates, delays, and reasons for any delays.
      • Cost Control: Evaluation of the vendor’s ability to meet agreed-upon pricing or costs, as well as any changes to the cost structure.
      • Compliance with Contractual Terms: A review of the vendor’s compliance with specific terms and conditions outlined in the contract, including legal, regulatory, and performance-related terms.
      • Customer Service and Communication: Evaluation of how effectively the vendor communicates with SayPro, handles inquiries, and provides ongoing support.
    3. Feedback and Ratings:
      • Internal feedback from various departments within SayPro (e.g., procurement, project management, finance) regarding the vendor’s performance.
      • A rating system (e.g., 1-5 or excellent/good/average/poor) for various performance criteria such as quality, timeliness, cost management, and customer service.
    4. Issues and Challenges:
      • A summary of any issues encountered during the evaluation period, such as late deliveries, quality problems, or failure to meet contract terms.
      • Root cause analysis for each issue, if applicable, including vendor response and resolution actions taken.
    5. Corrective Actions and Recommendations:
      • Specific actions recommended to address performance deficiencies, including timelines for improvement.
      • Suggestions for improving communication, compliance, or quality, depending on the issues identified in the previous section.
    6. Action Plan and Future Expectations:
      • Summary of the action plan for vendor improvement, including timelines and expectations for future performance.
      • Recommendations for any contractual adjustments or potential penalties if performance continues to fall short of expectations.
    7. Sign-offs and Approvals:
      • A section where relevant SayPro employees, such as contract managers or supply chain managers, can sign off on the accuracy of the report and the proposed actions.
      • Senior management may also sign off to approve the corrective actions or decisions regarding future contract renewal/termination.

    Document Flow and Submission:

    • The report is typically compiled and maintained by the Supply Chain Management (SCM) Team, Procurement Team, or any other department involved in managing vendor relations.
    • It should be updated monthly, with a review and discussion of the findings at regular team meetings.
    • The report should be submitted to higher management (e.g., Director of Supply Chain, Contract Managers, Senior Leadership) for review and action as necessary.
    • Any issues requiring immediate attention or escalation should be flagged in the report, with copies provided to relevant stakeholders.

    Important Notes:

    • Data Accuracy: Ensure all data used in the report is accurate, up-to-date, and relevant to the reporting period. Any discrepancies should be noted and investigated.
    • Confidentiality: Sensitive information regarding vendor performance, pricing, and contractual terms should be handled confidentially to maintain trust and competitive integrity.
    • Collaboration: Employees involved in vendor management should collaborate closely to ensure all aspects of the vendor’s performance are reviewed comprehensively, especially if the vendor serves multiple departments within SayPro.

    Associated Documents:

    • SayPro Monthly SCMR-1 Report: A key document related to the Vendor Performance Monitoring Report, providing a broader overview of vendor performance and contract awarding activities within the organization.
    • Vendor Contract Agreements: Original contracts, amendments, and any supporting documentation that outlines the specific terms and obligations for vendors.
    • Feedback Forms: Any surveys or forms filled out by internal stakeholders evaluating the vendor’s performance.

    By following these guidelines, SayPro ensures that vendor relationships are managed effectively, contracts are fulfilled to specification, and any potential issues are addressed promptly to maintain a high standard of service and quality.

  • SayPro Monthly Summary Report

    A summary of the contract awarding process, including the results, vendor feedback, and challenges faced

    Contents Required in the Report:

    Each Monthly Summary Report must include the following key sections in detail:


    1. Executive Summary

    • Overview of the month’s procurement activities.
    • Highlight of major contracts awarded.
    • Brief commentary on procurement strategy alignment with organizational goals.

    2. Contract Awarding Summary

    • List of all contracts awarded during the reporting month.
    • Include:
      • Contract title
      • Date awarded
      • Contract value
      • Duration of the contract
      • Name of the winning vendor
      • Type of procurement method used (e.g., RFQ, RFP, Direct Procurement)

    3. Vendor Feedback Summary

    • Summarized feedback received from vendors (both successful and unsuccessful).
    • Highlight any complaints or suggestions received.
    • Include how SayPro responded or intends to respond to the feedback.
    • Identify any recurring themes or concerns raised by vendors.

    4. Challenges Faced

    • Any obstacles encountered during the procurement or contract awarding process.
    • Examples:
      • Delays in evaluation
      • Vendor non-compliance
      • Budgetary constraints
      • System or communication issues
    • Include proposed or implemented solutions to mitigate these issues.

    5. Recommendations for Improvement

    • Suggestions based on current month’s experience.
    • Focus on process enhancement, vendor management, or internal coordination.

    6. Appendices (If Applicable)

    • Tender evaluation reports
    • Bid opening minutes
    • Vendor communication logs
    • Procurement committee recommendations
    • Any relevant documentation referenced in the report

    Format and Submission Guidelines:

    • Format: PDF preferred; Word document acceptable
    • Font: Arial, size 11, 1.15 line spacing
    • Naming Convention: SayPro_SCMR1_Month_Year.pdf (e.g., SayPro_SCMR1_January_2025.pdf)
    • Submission Method: Upload to SayPro Procurement Portal or email to SCMReports@saypro.org

    Review and Approval:

    • Submitted reports are reviewed by the SCM Manager and Director of Operations.
    • Feedback is provided by the 10th of the month for any corrections or follow-up actions.
  • SayPro Contract Draft

    A draft contract detailing the terms and conditions that will be agreed upon with the successful bidders

    1. Contract Draft

    Document Title: Contract Draft – SayPro Monthly January SCMR-1

    Purpose:
    The Contract Draft serves as the preliminary agreement framework between SayPro and the successful bidder(s). It outlines the terms and conditions, scope of work, performance standards, payment schedules, deliverables, and legal obligations.

    Details Required in the Contract Draft:

    • Contract Title: Should clearly state the nature of the engagement (e.g., “Provision of Training Services for Community Development – January 2025”).
    • Parties Involved:
      • SayPro (full legal name and address)
      • Contractor (successful bidder’s details)
    • Scope of Work:
      Clearly defined responsibilities, expected deliverables, and timelines.
    • Duration of the Contract:
      Start and end dates, including renewal or extension clauses if applicable.
    • Payment Terms:
      • Total contract value
      • Payment schedule (e.g., 40% on signing, 60% upon completion)
      • Mode of payment and invoicing procedures
    • Performance Standards:
      Key performance indicators (KPIs), service levels, and quality benchmarks.
    • Reporting Requirements:
      Frequency and format of progress reports, evaluation forms, and reviews.
    • Termination Clause:
      Conditions under which the contract may be terminated by either party, notice periods, and consequences of termination.
    • Confidentiality and Data Protection:
      Obligations regarding the handling of SayPro’s and client information.
    • Dispute Resolution:
      Mechanisms for handling disagreements, including arbitration or court jurisdiction.
    • Signatures and Date:
      Authorized signatories from both SayPro and the bidder’s side, including the date of signing.

    2. Additional Documents Required from Employees

    To ensure the integrity and readiness of the contracting process, the following supporting documents must also be submitted by relevant SayPro employees:

    • Conflict of Interest Declaration Form
      A signed document confirming that the employee has no personal or financial interest in any of the bidding companies.
    • Evaluation Committee Report (if applicable)
      For employees who participated in bid evaluation, a detailed report outlining the assessment process, scoring, and justification for selection.
    • Confidentiality Agreement
      Signed confidentiality agreement ensuring the employee will not disclose sensitive information related to the procurement process.
    • Attendance Register (Bid Opening and Evaluation Meetings)
      Signed records confirming the employee’s participation in key procurement meetings.
    • Compliance Checklist
      A completed checklist to confirm that all required steps in the procurement process were followed.

    Submission Instructions:

    • Deadline: All documents must be submitted within 5 working days of contract award notice.
    • Format: Submit scanned copies in PDF format via the SayPro Internal Procurement Portal or email to contracts@saypro.org.
    • Verification: Each document will be reviewed by the Procurement Compliance Officer before final approval and contract signing.
  • SayPro Tender and Proposal Submission Log

    A record of all tenders, proposals, and bids submitted, including submission deadlines and required documents

    1. Tender and Proposal Submission Log

    Purpose: This document serves as a centralized tracking and management tool that records all tenders, proposals, and bids submitted by SayPro. It helps maintain accountability, ensure timely submissions, and track the progress of various procurement opportunities.

    Employee Responsibilities: Employees involved in tendering or proposal preparation must ensure that all entries in the submission log are updated promptly and accurately.

    Contents of the Submission Log: Each entry in the Tender and Proposal Submission Log must include the following details:

    • Tender/Proposal/Bid Title
    • Reference Number (if applicable)
    • Client/Issuing Entity
    • Sector/Industry (e.g., Education, Health, Infrastructure)
    • Submission Deadline Date and Time
    • Date Submitted
    • Mode of Submission (e.g., online portal, email, hand delivery)
    • Responsible Person/Team
    • Required Documents Checklist (e.g., B-BBEE certificate, Tax Clearance, CSD report, Company Registration, Technical Proposal, Financial Proposal)
    • Status (Submitted, Pending, In Progress, Rejected, Awarded)
    • Comments/Notes (e.g., follow-up requirements, clarifications received)

    Supporting Documents to be Attached:

    • A copy of the submitted tender/proposal
    • Proof of submission (confirmation email, portal screenshot, etc.)
    • All accompanying documentation submitted with the tender

    2. SayPro Monthly January SCMR-1: SayPro Monthly Awarding Contracts

    Purpose: The SCMR-1 form is part of SayPro’s internal Supply Chain Management Reporting system. This specific document captures all contracts awarded during the month of January and ensures transparency and proper documentation of procurement activities.

    Employee Responsibilities: Employees in the SCM/Procurement department must complete the SCMR-1 at the end of every month, accurately listing all awarded contracts and ensuring supporting documentation is filed.

    Contents of SCMR-1:

    • Contract Award Reference Number
    • Date of Award
    • Awarded Supplier/Contractor Name
    • Type of Service/Product Procured
    • Total Contract Value
    • Procurement Method Used (e.g., Open Tender, Quotation, Single Source)
    • Number of Bids Received
    • BEE Status Level of Supplier
    • Contract Period/Duration
    • Contract Manager Assigned
    • Reason for Award (e.g., Best Price, Technical Score, Compliance)
    • Supporting Documents Checklist:
      • Bid Evaluation Report
      • Bid Adjudication Committee Approval
      • Award Letter
      • Signed Contract
      • Supplier CSD Profile and Compliance Documents

    Archiving and Compliance:

    • The completed SCMR-1 must be submitted to the Compliance and Finance Department by the 5th working day of the new month.
    • Digital and hard copies must be archived according to SayPro’s document retention policy.

    🔁 Summary Checklist for Employees:

    DocumentResponsible DepartmentFrequencyKey Actions
    Tender and Proposal Submission LogBusiness Development/SCMOngoing (per submission)Record all submissions, attach proof, maintain log
    SCMR-1: Monthly Awarding ContractsSCM/ProcurementMonthlyList all awarded contracts, complete checklist, submit to Compliance
  • SayPro Bid Evaluation Matrix

    A document detailing the evaluation of each bid based on predefined criteria, including scores and recommendations

    1. Bid Evaluation Matrix

    Purpose:
    The Bid Evaluation Matrix is a structured document used to assess and compare bids received in response to a tender. It ensures that all submissions are evaluated fairly based on predefined and approved evaluation criteria.

    Required Content:
    Employees responsible for evaluating bids must complete and submit the Bid Evaluation Matrix with the following elements:

    • Bidder Information: Names, company details, and reference numbers for each bidding entity.
    • Evaluation Criteria: Clearly defined criteria such as:
      • Price and cost competitiveness
      • Technical compliance
      • Experience and track record
      • Financial capability
      • B-BBEE score (if applicable)
    • Weighting of Criteria: Each criterion should have a predetermined weight approved prior to the bid opening.
    • Scoring Sheet: Scores assigned to each bidder per criterion, based on documentation review, presentations, or site visits.
    • Total Score and Ranking: Final score and ranking for each bidder based on cumulative weighted scores.
    • Comments and Justifications: Written rationale for scores awarded and any notable observations or concerns.
    • Evaluation Team Signatures: All evaluators must sign and date the matrix to verify participation and agreement.

    2. SayPro Monthly SCMR-1 Report – January Edition

    Purpose:
    The SayPro Monthly SCMR-1 report consolidates all contracts awarded during the month, including those recommended based on bid evaluations. For the January edition, employees are expected to provide input and documentation related to contracts awarded during that specific period.

    Required Submissions:
    To contribute to the SCMR-1 report, employees must provide:

    • Final Bid Evaluation Matrices: Completed and signed for all awarded contracts.
    • Award Recommendation Memorandum: A summary document that:
      • Recommends the successful bidder
      • Justifies the recommendation
      • Details the compliance with procurement policies
    • Conflict of Interest Declarations: Completed forms by all bid evaluation committee members.
    • Approval Documentation: Minutes of the adjudication committee meeting or relevant authority’s signed approval for the award.
    • Compliance Checklist: Confirming adherence to SayPro’s procurement procedures and legislative requirements.
    • Contract Summary Sheets: High-level summaries of the contracts awarded, including:
      • Contract value
      • Duration
      • Purpose
      • Supplier details
    • Risk Assessment Reports: (If applicable) Evaluations of risks associated with the selected supplier or contract.
    • Post-Award Communication Logs: Emails or notices sent to both successful and unsuccessful bidders.

    Submission Deadlines and Format

    • Submission Deadline for January Documents: By 5th February
    • Format: PDF format preferred; editable Excel/Word versions may be requested for verification.
    • Submission Platform: SayPro SCM Internal Portal > Contract Award Documents > 2025 > January Folder

    Compliance Note

    Failure to submit the above documentation may result in delays in contract activation, non-compliance with internal controls, and potential audit findings. SayPro reserves the right to request clarification or additional information if discrepancies are identified during the SCMR compilation process.

  • SayPro Offer insights into areas for improvement in the future

    1. Introduction

    As part of SayPro’s ongoing commitment to excellence, transparency, and operational efficiency, this section of the monthly reporting process focuses on identifying opportunities for continuous improvement in procurement and contract awarding practices. Based on the lessons learned during the January 2025 SCMR-1 cycle, this analysis aims to enhance future processes by addressing key inefficiencies, systemic gaps, and stakeholder concerns.


    2. Identified Areas for Improvement


    2.1. Procurement System Optimization

    Observation:
    The SayPro e-Procurement portal experienced frequent slowdowns and occasional downtime during peak periods of vendor activity.

    Impact:
    This caused submission delays and technical frustrations among vendors, potentially affecting the competitiveness of the bidding process.

    Recommendation:

    • Upgrade the procurement platform to a more scalable and resilient system.
    • Introduce real-time status monitoring and alert systems for IT administrators.
    • Conduct stress testing before major procurement cycles.

    2.2. Enhanced Bidder Support and Capacity Building

    Observation:
    A significant portion of vendor submissions were disqualified due to non-compliance, missing documents, or failure to follow submission guidelines.

    Impact:
    This reduces competition and can delay the awarding process due to re-evaluations or the need to reissue tenders.

    Recommendation:

    • Offer pre-bid workshops or webinars explaining the tender process and expectations.
    • Create a “Bidder Toolkit” with templates, FAQs, and a checklist.
    • Launch a Vendor Help Desk for real-time support during submission periods.

    2.3. Consistency in Evaluation Criteria Application

    Observation:
    Evaluation panels from different departments showed slight variations in interpreting scoring criteria, especially in multi-sectoral or joint-evaluation contracts.

    Impact:
    This introduces potential bias or inconsistency in vendor assessment outcomes.

    Recommendation:

    • Standardize evaluation rubrics and conduct pre-evaluation alignment sessions with all panel members.
    • Introduce a centralized Quality Assurance Officer to review evaluation results for consistency.
    • Use calibration exercises to ensure uniform understanding and application of scoring guidelines.

    2.4. Feedback Mechanism for Unsuccessful Bidders

    Observation:
    Several vendors expressed frustration over not receiving detailed feedback after being unsuccessful in the bidding process.

    Impact:
    Lack of feedback prevents vendors from improving their proposals and can discourage future participation.

    Recommendation:

    • Establish a structured post-bid debrief process, including written feedback reports.
    • Offer optional one-on-one feedback sessions for high-value or complex tenders.
    • Use anonymized case studies from unsuccessful bids as educational tools during future training.

    2.5. Strengthening Stakeholder Inclusion and Transparency

    Observation:
    Community-level stakeholders, especially in the community development and service delivery sectors, requested more involvement in the vendor selection process.

    Impact:
    Limited local input can result in contracts being awarded to vendors with minimal understanding of community dynamics.

    Recommendation:

    • Implement a participatory procurement model for community-impact contracts, allowing representatives to provide input during evaluation.
    • Host community consultations prior to releasing tenders to align requirements with on-the-ground realities.
    • Introduce a Community Liaison Officer in relevant projects to serve as a bridge between SayPro and local stakeholders.

    2.6. Improved Contract Award Communication Timelines

    Observation:
    There were instances of delays in notifying vendors of award decisions, especially in cases requiring internal approvals or cross-departmental coordination.

    Impact:
    Delayed communication disrupts project start-up timelines and affects vendor scheduling and resource planning.

    Recommendation:

    • Set internal timelines and SLAs for contract review and award communication.
    • Digitize the approval workflow to enable real-time tracking and faster turnaround.
    • Notify vendors of expected timelines upfront and provide status updates if delays occur.

    3. Conclusion

    The January 2025 SCMR-1 contract awarding cycle provided valuable insights into SayPro’s procurement ecosystem. While the process demonstrated strengths in procedural transparency and sectoral diversity, several areas require targeted improvements to enhance efficiency, vendor experience, and stakeholder engagement.

    Addressing the identified gaps will not only streamline the procurement cycle but also reinforce SayPro’s reputation as a best-practice leader in development-focused procurement.


    4. Next Steps

    • Circulate this insights report to all department heads and procurement staff.
    • Develop an action plan to implement the above recommendations before the next procurement cycle.
    • Include improvement progress as a standing item in future SCMR performance reviews.
  • SayPro Provide a report on the monthly contract awarding process

    1. Overview

    This report provides a comprehensive review of the contract awarding process for January 2025 under the SayPro Strategic Contract Management and Reporting Framework (SCMR-1). The purpose is to promote transparency, monitor performance, and inform continuous improvement in procurement and contract management practices.


    2. Total Number of Contracts Awarded

    During the January 2025 cycle, SayPro processed and finalized procurement under various operational and developmental categories.

    Sector / DepartmentNo. of Contracts Awarded
    Education & Training Services6
    Community Development4
    ICT Support & Solutions3
    Health & Wellness Programs2
    Infrastructure & Logistics5
    Total20 Contracts

    Each awarded contract was reviewed and approved based on its compliance with the set technical and financial evaluation criteria as detailed in the January SCMR-1 procurement guidelines.


    3. Stakeholder Feedback

    Feedback was gathered from various internal and external stakeholders involved in or impacted by the contract awarding process, including:

    • Procurement teams
    • Departmental project leads
    • Vendors (both successful and unsuccessful)
    • Community representatives and implementation partners

    Positive Feedback Highlights:

    • Improved Clarity of Tender Documents: Vendors appreciated the use of standardized templates and clearer evaluation criteria.
    • Efficiency in Evaluation Timeline: Internal teams noted a quicker turnaround in evaluation and contract finalization compared to previous months.
    • Enhanced Communication Channels: Stakeholders felt that SayPro’s procurement office was responsive to queries and support requests during the process.

    Constructive Feedback / Concerns:

    • Vendor Portal Downtime: Temporary system outages caused submission delays for some applicants.
    • Feedback for Unsuccessful Vendors: Some vendors requested more detailed feedback on why their bids were unsuccessful.
    • Community Input on Awarded Projects: In some sectors, particularly community development, there was a desire for more direct input into vendor selection from local beneficiaries.

    4. Challenges Encountered

    Several challenges were observed during the contract awarding process:

    a. Technical Issues

    • System Performance: The e-Procurement portal experienced intermittent downtime during peak submission days, causing delays and frustration among bidders.
    • File Size Upload Limitations: Vendors struggled with uploading large technical proposals, prompting a mid-cycle adjustment to submission guidelines.

    b. Evaluation Bottlenecks

    • High Volume of Submissions: Some sectors, notably ICT and Infrastructure, received a higher-than-expected number of bids, slowing the evaluation phase.
    • Cross-Departmental Coordination: In multi-sectoral projects, delays arose from inconsistent evaluation criteria application across departments.

    c. Vendor Readiness

    • Incomplete Proposals: A significant number of bids (approximately 22%) were disqualified due to missing documentation or failure to meet basic compliance criteria.
    • Limited Bidding from New Vendors: Some emerging suppliers cited difficulty accessing procurement opportunities due to lack of familiarity with SayPro systems.

    5. Recommendations for Improvement

    To address the feedback and challenges, the following actions are recommended:

    • Upgrade Procurement Platform: Implement a more robust and scalable system to handle high traffic and large file uploads.
    • Create a Vendor Support Desk: Offer live assistance and pre-submission reviews to help vendors meet compliance standards.
    • Expand Post-Evaluation Feedback: Introduce detailed debrief sessions for unsuccessful vendors to improve transparency and capacity building.
    • Enhance Community Participation: Develop a participatory procurement model for community-impact projects to increase local stakeholder input.

    6. Conclusion

    The January 2025 contract awarding cycle under SCMR-1 marked a step forward in SayPro’s commitment to efficient, transparent, and inclusive procurement. While there were notable successes, such as increased stakeholder engagement and streamlined processes, key areas for improvement remain. Addressing these proactively will strengthen SayPro’s procurement framework and enhance its reputation as a fair and effective contracting organization.