Conduct a thorough review of all received bids for tenders, proposals, and quotations

πŸ“Œ Objective:

To ensure a fair, transparent, and methodical assessment of all bids received in response to SayPro tenders, proposals, or quotations. This process is essential for identifying the most responsive, technically compliant, and cost-effective bid in alignment with SayPro’s procurement policies and applicable regulations.


🧾 Document Title: Bid Submission Review Report


πŸ“‹ Step-by-Step Review Process of Bid Submissions

The review of bids should be conducted in three main phases:


πŸ”Ή Phase 1: Receipt & Preliminary Verification

Purpose: Ensure that only compliant bids proceed to full evaluation.

Key Actions:

  1. Bid Opening Register:
    • Log each bid received.
    • Include: Date/time received, bidder name, bid reference number, format (physical/electronic), and person who received/opened it.
  2. Initial Compliance Screening:
    • Check for:
      • Submission before deadline
      • Properly sealed and marked envelopes
      • Signed and completed forms
      • All mandatory documents included (e.g., tax clearance, company registration, B-BBEE certificate, etc.)
      • Adherence to format and instructions
  3. Disqualification (if applicable):
    • Record any non-compliant bids in the Bid Rejection Report
    • Justify the reason for exclusion (e.g., late submission, unsigned documents)

πŸ”Ή Phase 2: Technical Evaluation

Purpose: Assess how well each bidder meets the technical and functional requirements.

Key Actions:

  1. Establish an Evaluation Committee:
    • Minimum of 3 members with relevant expertise
    • Must sign a Conflict of Interest and Confidentiality Declaration
  2. Develop a Scorecard:
    • Based on criteria in the RFP/RFQ/Tender
    • Categories may include:
      • Experience and track record
      • Methodology and work plan
      • Team qualifications
      • Compliance with technical specifications
      • Innovation or value-adds
  3. Scoring Process:
    • Use agreed scoring matrix (e.g., 0-5 or 0-100 scale)
    • Score independently, then meet to consolidate
    • Record final technical scores for each bidder
  4. Minimum Threshold:
    • Only bidders who meet the minimum technical threshold (e.g., 70%) proceed to financial evaluation

πŸ”Ή Phase 3: Financial Evaluation

Purpose: Compare pricing proposals of technically qualified bidders for value for money.

Key Actions:

  1. Open Financial Proposals:
    Only for bidders who passed the technical stage
  2. Assess the Following:
    • Total price (including VAT)
    • Cost breakdowns and pricing structure
    • Reasonableness and market competitiveness
    • Any conditional pricing or anomalies
  3. Apply Weighted Evaluation (if applicable):
    • E.g., 80/20 or 90/10 scoring split between technical and financial components
  4. Price Normalization:
    • Correct for errors or inconsistencies where necessary (e.g., arithmetic checks)

πŸ”Ή Summary Compilation

Each bid’s results should be summarized in a Bid Evaluation Summary Table that includes:

BidderCompliance (Y/N)Technical Score (%)Financial Score (%)Final Score (%)Rank
Company AYes827880.41
Company BYes757073.02
Company CNo (Non-compliant)Rejected

πŸ“Œ Link to SayPro Monthly January SCMR-1: SayPro Monthly Bid Evaluation

For the January SCMR-1 Report:

  • Each bid opportunity evaluated must include a Bid Submission Review
  • Reference numbers of bids, list of bidders, compliance status, technical and financial scores must be included in the SCMR-1 file
  • Supporting documents (evaluation matrices, scoring sheets, compliance checklists) must be attached
  • Final ranking must correspond with the Award Decision Memo

πŸ—“οΈ Timeline and Submission Requirements

  • Bid Review should be completed within 5–7 working days from the bid closing date
  • All completed reviews must be submitted as supporting documentation with the SCMR-1 Report by February 5, 2025

βœ… Compliance Checklist for Bid Reviews

ItemDescriptionCompleted (βœ”οΈ/❌)
Bid Opening RegisterLogged and signedβœ”οΈ
Preliminary Compliance ChecklistSubmittedβœ”οΈ
Technical Evaluation ScoresConsolidated and signedβœ”οΈ
Financial Comparison TableCompletedβœ”οΈ
Final RankingConfirmed and documentedβœ”οΈ

πŸ“Ž Optional Attachments

  • Evaluation Scorecards
  • Bid Comparison Sheet
  • Evaluator Declarations
  • Meeting Minutes (Evaluation Committee)
  • Signed Copy of Tender Document (by winning bidder)